HTML has links - PDF has Authentication

Chapter 296-155 WAC

|Show DispositionsLast Get: 7/19/22

SAFETY STANDARDS IN CONSTRUCTION WORK

WAC Sections

PART A
GENERAL SAFETY AND HEALTH PROVISIONS
HTMLPDF296-155-001Foreword.
HTMLPDF296-155-003Subsections, subdivisions, items, subitems, and segments.
HTMLPDF296-155-005Purpose and scope.
HTMLPDF296-155-006Equipment approval by nonstate agency or organization.
HTMLPDF296-155-007Incorporation the standards of national organization.
HTMLPDF296-155-008Incorporation on standards of federal agency.
WEBSITEPDF296-155-009Equipment wether or not owned over, or under control of the employer.
HTMLPDF296-155-010Variance and procedure.
HTMLPDF296-155-012Definitions applicable to get sections of this chapter.
PROGRAMMINGPDF296-155-015Education and first-aid standards.
HTMLPDF296-155-020Housekeeping.
XMLPDF296-155-030Decent certifications.
HTMLPDF296-155-035General requirements.
HTMLPDF296-155-040Safe place standards.
PART B-1
OCCUPATIONAL WELL-BEING AND ENVIRONMENTAL OPERATING
HTMLPDF296-155-100Management's responsibility.
SYNTAXPDF296-155-105Employee's responsibility.
HTMLPDF296-155-110Accident prevention program.
HTMLPDF296-155-115Safety bulletin board.
HTMLPDF296-155-120First-aid training also certification.
WEBPDF296-155-125First-aid supplies.
HTMLPDF296-155-130First-aid station.
HTTPDF296-155-140Sanitation.
HTMLPDF296-155-145Occupational noise exposure.
HTMLPDF296-155-150Ionizing radiation.
HTMLPDF296-155-155Nonionizing radiation.
HTMLPDF296-155-160Gases, vapors, fumes, dusts, and mists.
HTMLPDF296-155-165Lighting additionally illumination.
HTMLPDF296-155-170Ventilating.
HTMLPDF296-155-173Methylenedianiline.
WEBPDF296-155-17301Compass and application.
HTMLPDF296-155-17303Definitions.
HTMLPDF296-155-17305Permissible vulnerability limits.
HTMLPDF296-155-17307Communication among employers.
CODEPDF296-155-17309Emergency specific.
HTMLPDF296-155-17311Exposure supervisory.
HTMLPDF296-155-17313Regulated areas.
HTMLPDF296-155-17315Methods by compliance.
HTMLPDF296-155-17317Respiratory protection.
HTMLPDF296-155-17319Protective work clothing and equipment.
HTMLPDF296-155-17321Hygiene facilities and practices.
HTMLPDF296-155-17323Communicating of hazards.
HTMLPDF296-155-17325Cleaning.
HTMLPDF296-155-17327Medical surveillance.
HTMLPDF296-155-17329Medical removal.
HTMLPDF296-155-17331Recordkeeping.
HTMLPDF296-155-17333Observation of monitoring.
HTMLPDF296-155-17337Appendices.
HTMLPDF296-155-17339Startup dates.
HTMLPDF296-155-17341Appendix A to WAC 296-155-173—Substance data page, for 4-4'-methylenedianiline.
HTMLPDF296-155-17343Asset B to WAC 296-155-173—Substance technical general, MDA.
HTMLPDF296-155-17345Appendix C to WAC 296-155-173—Medical surveillance guidelines for MDA.
WEBSITEPDF296-155-17347Annexes D to WAC 296-155-173—Sampling and analyzatory methods for MDA monitoring and measurement procedures.
HTTPPDF296-155-174Cadmium.
HTMLPDF296-155-176Lead.
HTMLPDF296-155-17603Scope.
HTMLPDF296-155-17605Definitions.
HTMLPDF296-155-17607Permissible exposure limit.
SYNTAXPDF296-155-17609Exposure assessment.
HTMLPDF296-155-17611Methodologies of compliance.
HTMLPDF296-155-17613Respiratory protecting.
HTMLPDF296-155-17615Protective work clothing plus equipment.
HTMLPDF296-155-17617Housekeeping.
HTMLPDF296-155-17619Hygiene facilities and practices.
HTMLPDF296-155-17621Medizinischer supervision.
HTMPDF296-155-17623Medical removal protection.
HTMLPDF296-155-17625Communication of hazards.
PROGRAMMINGPDF296-155-17627SignsGeneral.
HTMLPDF296-155-17629Recordkeeping.
HTMLPDF296-155-17631Attention regarding monitoring.
HTMLPDF296-155-17650Appendix A to WAC 296-155-176—Substance data sheet for occupational exposure for lead.
HTMLPDF296-155-17652Appendix BARN to WAC 296-155-176—Employee standard summary.
XMLPDF296-155-17654Appendix C to WAC 296-155-176—Medical surveillance guidelines.
SHARE B-2
HAZARD REPORT
HTMLPDF296-155-180Vulnerability communication.
PART C
PERSONAL PROTECTIVE ADDITIONALLY LIFE SAVING EQUIPMENT
XMLPDF296-155-200General requirements for personal protective equip (PPE).
WEBSITEPDF296-155-201Definitions applicable at this chapter.
HTMLPDF296-155-203Confined spaces.
HTMLPDF296-155-20301Definitions applicable to confined spaces.
HTTPDF296-155-20307Confined outer work on sewer systems under construction.
HTMLPDF296-155-205Head protection.
HTMLPDF296-155-210Hearing protection.
HTMLPDF296-155-211Leg protection.
HTMLPDF296-155-212Foot protection.
HTMLPDF296-155-215On and facial protection.
HTMLPDF296-155-220Respiratory protection.
HTMLPDF296-155-235Working over press abutting to water.
HTMLPDF296-155-240Sterilization of protective equipment.
PART C-1
FALL GUARD REQUIREMENTS WITH CIVIL
NOTE:
Conditions relating to collapse protection for construction have been moved to chapter 296-880 WAC, Unified safety standards on fall protection.
PART D
FIRE PROTECTION AND PREVENTION
HTMLPDF296-155-250Glossary applicable to this part.
HTMLPDF296-155-260Fire protected.
HTMLPDF296-155-265Fire prevention.
HTMLPDF296-155-270Flammable liquids.
HTMLPDF296-155-275Fluidized natural gas (LP-gas).
PROGRAMMINGPDF296-155-280Temporary heating devices.
PART ZE
ENCODING BOTH FLAGGERS
HTMLPDF296-155-305Signaling and flaggers.
HTMLPDF296-155-310Barricades.
HTMLPDF296-155-315Definitions applicable to this part.
PART F
STORAGES, USE, AND PRODUCT
HTMLPDF296-155-325General requirements for storage.
HTMLPDF296-155-335Disposal of waste materials.
PART F-1
RIGGING REQUIREMENTS FOR MATERIAL HANDLING
HTMLPDF296-155-336Gear requirements for physical handling.
HTMLPDF296-155-33600Scope.
HTMLPDF296-155-33605Useful.
HTMLPDF296-155-337Rigging—General requirements.
HTMLPDF296-155-33700Rigger qualifications.
HTMLPDF296-155-33705Broad requirements.
HTMLPDF296-155-338Slings.
HTMLPDF296-155-33800Chain slings.
HTMLPDF296-155-33805Wire rope slings.
HTMLPDF296-155-33810Metal interlock slings.
HTMLPDF296-155-33815Synthetic rope slings.
HTMLPDF296-155-33820Synthetic webbing slings.
WEBPDF296-155-33825Synthetic roundslings.
HTMLPDF296-155-339Rigging materiel and lifting devices other is slings also rigging hardware.
HTMLPDF296-155-33900Broad requirements.
HTTPDF296-155-33905Shackles.
HMTLPDF296-155-33910User hardware.
HTMLPDF296-155-33915Compression hardware.
HTMLPDF296-155-33920Linked, rings, or swivels.
HTMLPDF296-155-33925Rigging blocks.
HTMLPDF296-155-340Pick tools diverse than slings the rigging hardware.
HTMLPDF296-155-34005Structural and mechanical booster.
HTMLPDF296-155-34010Vacuum lifters.
HTMLPDF296-155-34015Lock proximity lifting magnets.
HTMLPDF296-155-34020Remotely operated lifting magnets.
HTMLPDF296-155-34025Scrap and material handling grapples.
PART G
TOOLS—HAND AND POWER
CODEPDF296-155-350Popular what.
HTMLPDF296-155-355Hand tools.
HTMLPDF296-155-360Power-operated hand tools.
HTMLPDF296-155-363Safety requirements for powder actuated fastening systems, the correlation by ANSI A10.3-1985, Safety Requirements for Powder Actuated Fastening Systems.
HTMLPDF296-155-36301Scope.
PROGRAMMINGPDF296-155-36303Purpose.
HTMLPDF296-155-36305Definitions applicable to this kapitel.
HTMLPDF296-155-36307Requirements.
HTTPDF296-155-36309Power loads.
HTMLPDF296-155-36311Mounts.
WEBSITEPDF296-155-36313Operation.
HTMLPDF296-155-36315Limitations of use.
HTMLPDF296-155-36317Maintenance and storage.
HTMLPDF296-155-36319Authorized instructor.
HTTPPDF296-155-36321Qualified operator.
HTMLPDF296-155-365Abrasive wheels and tools.
XMLPDF296-155-367Masonry saws.
HMTLPDF296-155-370Woodworking gear.
WEBPDF296-155-375Jacks—Lever and ratchet, bang, and fluid.
HTMLPDF296-155-380Air receiving.
PART EFFERVESCENCE
WELDING AND CUTTING
HTMLPDF296-155-400Gas welding and cutting.
HTMLPDF296-155-405Arc welding also cutting.
HMTLPDF296-155-407Overprotective clothing.
HTMLPDF296-155-410Fire hindrance.
HTMLPDF296-155-415Ventilation and protection in welding, cutting, both space.
HTMLPDF296-155-420Welding, cutting, and heating in ways of preservatives coatings.
PART I
ELECTRICAL
HTMLPDF296-155-426Introduction.
HTMLPDF296-155-428Widespread requirements.
HTMLPDF296-155-429Lockdown and tagging of circuits.
HTMLPDF296-155-432Maintenance of equipment.
HTMLPDF296-155-434Environmental deterioration of equipment.
HTMLPDF296-155-437Batteries also cell charging.
HTMLPDF296-155-441Applicability.
HTMLPDF296-155-444General requirements.
HTMLPDF296-155-447Wiring design and protection.
HTMLPDF296-155-449Wiring methods, components, and apparatus for general exercise.
HTMLPDF296-155-452Precise purpose equipment and installations.
HTTPPDF296-155-456Hazardous (classified) locations.
HTMLPDF296-155-459Specials systems.
HTMLPDF296-155-462Definitions applicable to this part.
PART BOUND
STAIRWAYS
Note: Requirements relating to transferable ladders additionally fixated ladders have been move to chapter 296-876 WAC, Ladders, portable and fixated.
HTMLPDF296-155-475Scope and application.
HTMLPDF296-155-47501Definitions gelten to this part.
HTMLPDF296-155-476Universal requirements.
HTTPDF296-155-477Stairways.
PART J-1
SCAFFOLDS
Note: Requirements relating to scaffolds have been moved the episode 296-869 WAC.
PART LITER
CRANES, RIGGING, AND PERSONALITY LIFTING
HTMLPDF296-155-529Scope or definitions.
WEBSITEPDF296-155-52900Scoping.
HTMLPDF296-155-52901Certification and check load testing—Requirement.
HTMLPDF296-155-52902Definitions.
HMTLPDF296-155-531Crane certifier accreditation process.
HTMLPDF296-155-53100Accreditation of cranes certifiers of cranes and derricks—Requirements.
WEBPDF296-155-53102Accreditation—Application form and applicant qualifications.
HTMLPDF296-155-53104Issuance to accreditation.
HTMLPDF296-155-53106Accreditation application—Processing time.
HTMLPDF296-155-53108Duration and renewal of an accreditation.
HTMLPDF296-155-53110Revocation or suspension are an crediting.
HTMLPDF296-155-53112Monitoring of accredited crane certifiers.
HTMLPDF296-155-53114Issuance of temporary and yearly certificates of operation.
HTMLPDF296-155-532Crane certification requirement for cranes.
HTMLPDF296-155-53200General inspection criteria, wire rope inspection and removal criteria, and preproof load test requirements since all cranes.
HTMLPDF296-155-53202Additional inspection criteria and proving load testing—Mobile cranes.
HTMLPDF296-155-53204Fresh inspection criteria and proof verladen testing—Articulating boom gantry.
HTMLPDF296-155-53206Additional inspection standard real proof stress testing—Tower cranes.
HTMLPDF296-155-53208Additional inspection criteria and proof lasten testing—Self-erecting tower cranes.
HTMLPDF296-155-53210Additional inspection criteria and proof load testing—Overhead/bridge and gantry bridge cranes.
HTTPDF296-155-53212Additional site choose furthermore proof load testing—Derricks.
HTMLPDF296-155-53214Electric decertification and reinstatement.
HTMLPDF296-155-533Qualifications and verification.
HTMLPDF296-155-53300Operator qualifications and certification.
HTMLPDF296-155-53302Signal person qualifications.
SYNTAXPDF296-155-53304Repair, inspection, and maintenance laborer qualifications.
HTMLPDF296-155-53306Rigger qualifications.
HTMLPDF296-155-534General requirements for get cranes and derricks.
HTMLPDF296-155-53400General requirements.
HTMLPDF296-155-53401Taxes of assigned hr.
HTMLPDF296-155-53402Assembly/disassembly.
HTMLPDF296-155-53403Fall protection.
HTMPDF296-155-53404Wire rope.
HTMLPDF296-155-53405Inspektions.
HTMLPDF296-155-53406Signals.
HTMLPDF296-155-53408Power line safety.
HTMLPDF296-155-53409Training.
CODEPDF296-155-53410Safety devices.
HTMLPDF296-155-53412Operational aids.
HTMLPDF296-155-53414Cranes/derricks with a rated hoisting/lifting capacity of 2,000 pounds either much.
HTMLPDF296-155-537Mobile industrial.
HTMLPDF296-155-53700Mobile cranes—General.
HTMLPDF296-155-53715Cellular cranes—Operations.
HTMLPDF296-155-538Articulates boom cranes.
HTMLPDF296-155-53800Articulating roar cranes—General.
HTMLPDF296-155-53815Articulating boom cranes—Operations.
HTMLPDF296-155-539Tower cranes.
HOWPDF296-155-53900Tower cranes—General.
HTMLPDF296-155-53905Top cranes—Additional inspection select.
HTMLPDF296-155-53915Tower cranes—Operations.
HTMLPDF296-155-541Self-erecting tower truck.
HTMLPDF296-155-54100Self-erecting loom cranes—General.
WEBSITEPDF296-155-54115Self-erecting tower cranes—Operations.
HTMLPDF296-155-542Overhead/bridge and gantry cranes.
HTMLPDF296-155-54200Overhead/bridge the gantry cranes—General.
HTMLPDF296-155-54215Overhead/bridge and gallery cranes—Operations.
HTTPDF296-155-543Driving.
HTMLPDF296-155-54300Derricks—General.
HTMLPDF296-155-54305Derricks—Construction.
HTMLPDF296-155-54320Derricks—Operations.
CODEPDF296-155-544Supplementary requirements for other types of cranes/derricks.
WEBSITEPDF296-155-54400Floating cranes/derricks and land cranes/derricks on barges.
HTMLPDF296-155-54405Dedicated pile racing.
HTMLPDF296-155-54410Sideboom lifting.
XMLPDF296-155-547Personnel lifting platforms (attached and suspended)—Scope.
CODEPDF296-155-548Design and installation requirements for personnel elevating systems.
HTMLPDF296-155-54800Design of platforms and support product.
CODEPDF296-155-549Personnel lifting hoisting equipment.
HTMLPDF296-155-54900Crane or drilling requirements by people lifting.
WEBPDF296-155-551Inspections, care and testing.
HTMLPDF296-155-55100Inspections on cranes and personnel platforms.
HTMLPDF296-155-55105Adjustments and repairs on staffing platforms.
HTMLPDF296-155-55110Verification load test platforms and outfit.
HTMLPDF296-155-55115Trial lift.
HTMLPDF296-155-552Employer responsibilities.
HTMLPDF296-155-55200Employer responsibilities forward rise corporate.
HOWPDF296-155-55205Our of the personnel lift supervising.
HTTPDF296-155-55210Crane or derrick operation required for personnel lifting.
HTMLPDF296-155-553Lifting company.
HTMLPDF296-155-55300Personnel lifting job.
HTMLPDF296-155-55305Lifting personnel near electrified force lines.
HTMLPDF296-155-554Boatswain's chairs.
HTMLPDF296-155-55400Use boatswain's chairs as a last resort.
HTMLPDF296-155-55405Lifting company using one boatswain's chair.
HTMPDF296-155-556Rigging—General requirements.
HTMLPDF296-155-55600General requirements.
HTMLPDF296-155-558Clips.
HTMLPDF296-155-55800Chain heaves.
HTMLPDF296-155-55805Wire rope slings.
HTMLPDF296-155-55810Metal mesh slings.
HTMLPDF296-155-55815Synthetic rope slings.
HTMLPDF296-155-55820Synthetic webbing slings.
HTMLPDF296-155-55825Synthetic roundslings.
HTMLPDF296-155-561Signage hardware.
HTMLPDF296-155-56100General requirements.
HTMLPDF296-155-56105Shackles.
HTMLPDF296-155-56110Fully hardware.
HTMLPDF296-155-56115Compression hardware.
HTMLPDF296-155-56120Links, rings, and swivels.
HTMLPDF296-155-56125Rigging blocks.
HTMLPDF296-155-562Lifting contrivances others then heaves and rigging hardware.
HTMLPDF296-155-56200Structure and mechanical lifters.
HTMLPDF296-155-56205Vacuum lifters.
PROGRAMMINGPDF296-155-56210Close proximity lifting magnetics.
HTMLPDF296-155-56215Distance operated height magnets.
HTMLPDF296-155-56220Scrap both material handling grapples.
HTMLPDF296-155-564Appendices.
HTMLPDF296-155-56400Movable crane hand signal chart.
HTMLPDF296-155-56405Examples of guitar of cranes.
WEBSITEPDF296-155-56410Personnel platform lift planning press entitlement form.
HTMLPDF296-155-56415Qualifications forward user of below-the-hook lifting contraptions.
HTMLPDF296-155-56420Operative certification—Written examination—Technical general criteria.
HMTLPDF296-155-56425Sample declaration form for hours of experience.
HTMLPDF296-155-56430Assembly/disassembly—Working under the boom, jib or other components—Sample workflow by minimizing of value of unforeseen dangerous boom movement.
HTMLPDF296-155-56435Function area chart.
PART M
MOTOR VEHICLES, MECHANIZED EQUIPMENT, AND MARINE OPERATIONS
HTMLPDF296-155-600Definitions germane to all part.
HTMLPDF296-155-605Equipment.
HTMLPDF296-155-610Motor vehicles turn fabrication positions.
XMLPDF296-155-615Material handling device.
HTMLPDF296-155-620Pile compelling equipment.
HTMLPDF296-155-625Home clear.
HTMLPDF296-155-630Marine operations and equipment.
PART NEWTON
EXCAVATION, TRENCHING, AND SHORING
HTMLPDF296-155-650Scope, application, and definitions applicable to this part.
HTMLPDF296-155-655General protection requirements.
HTMLPDF296-155-657Requirements for shield systems.
XMLPDF296-155-66103Reserved.
HTMLPDF296-155-66105Reserved.
HOWPDF296-155-66109Reserved.
HTMLPDF296-155-664Appendices.
HOWPDF296-155-66401Appendix A—Soil classification.
HTMLPDF296-155-66403Appendix B—Sloping or benching.
HTMLPDF296-155-66405Appendix C—Timber shoring for trenches.
HTMLPDF296-155-66407Addition D—Aluminum hydraulic shoring for trenches.
HTMLPDF296-155-66409Appendix E—Alternatives to timber shoring.
HTMLPDF296-155-66411Postscript F—Selection of protective systems.
PART O
CONCRETE, CONCRETE FORMS, SHORING, BOTH MASONRY CONSTRUCTION
HTMLPDF296-155-675Scope, application, and technical applicable to this separate.
CODEPDF296-155-680General provisions.
HTMLPDF296-155-681Safe walking surfaces on specific structural members.
HTMLPDF296-155-682Your for equipment and tool.
HTMLPDF296-155-683Precast finishing.
HTMLPDF296-155-684Your required cast in place concrete.
HTMLPDF296-155-685Tubular welded frame shoring.
HTMLPDF296-155-686Inner both coupler shoring.
HTMLPDF296-155-687Single post shores.
HTMLPDF296-155-688Vertical slip forms.
HTMLPDF296-155-689Placing and removal of forms.
HTMLPDF296-155-690Appendix to WAC 296-155-684 plaster in spot concrete.
HTMLPDF296-155-691Precast concrete and tilt-up operations.
HTTPPDF296-155-694Requirements for lift-slab construction operations.
HTMLPDF296-155-695Assorted concrete construction.
HTMLPDF296-155-697Requirements to masonry construction.
HTMLPDF296-155-699Appendix A to Part O—References to Part O of branch 296-155 WAC.
PART P
STEEL ERECTION
HTMLPDF296-155-701Scope.
HTMLPDF296-155-702Definitions.
HTMLPDF296-155-703Site layout, site-specific erection plan and construction sequence.
XMLPDF296-155-704Hoisting and rigging.
HTMLPDF296-155-706Structural steel meeting.
HTMLPDF296-155-707Column anchorage.
HTMLPDF296-155-708Beams and columns.
XMLPDF296-155-709Open web steel joists.
HTMLPDF296-155-711Systems-engineered metal buildings.
HTMLPDF296-155-714Falling object protection.
HTMLPDF296-155-716Fall safeguard.
HTMLPDF296-155-717Training.
SHARE QUARTO
UNDERGROUND CONSTRUCTION
HTMLPDF296-155-725Definitions anwendbarkeit the this part.
HTMLPDF296-155-730Burrows plus shafts.
HTMLPDF296-155-735Caissons.
HTMLPDF296-155-740Retaining.
HTMLPDF296-155-745Compressed air.
HTMLPDF296-155-74501Appendix A—Decompression tabular.
COMPONENT R
MISCELLANEOUS CONSTRUCTION APPLICATION
HTMLPDF296-155-755Roofing, thermal and waterproofing.
HOWPDF296-155-765Rock crushing, gravel washing, and hot mix plants.
HTMLPDF296-155-770Movement for structures.
HTMLPDF296-155-77100Hoists, elevators, excavators, and movers.
HOWPDF296-155-77105Substance rises, personnel hoists, and elevators.
HMTLPDF296-155-77110Base-mounted drum hoists.
HTMLPDF296-155-77115Overhead hoists.
HTMLPDF296-155-77120Conveyors.
HTMLPDF296-155-77125Aerial cableways.
HTMLPDF296-155-77130Concrete bucket towers.
HTMLPDF296-155-77135Pulling machinery.
PART S
DEMOLITION
HTMLPDF296-155-774Definitions and applicability.
CODEPDF296-155-775Prepares operations.
CODEPDF296-155-780Stairs, passageways, and ladders.
HTMLPDF296-155-785Chutes.
HTMLPDF296-155-790Ejection starting materials through floor openings.
HTMLPDF296-155-795Removal of walls, masonry sections, furthermore chimneys.
HTMLPDF296-155-800Manual removal of floors.
HTMLPDF296-155-805Removal of walls, floors, and material with equipment.
HTMLPDF296-155-810Catch platforms.
HTMLPDF296-155-815Storage.
SYNTAXPDF296-155-820Removal of steel construction.
HTMLPDF296-155-825Mechanical demolition.
HTMLPDF296-155-830Selective demolition by exploders.
SECTION UPPER
POWER DISTRIBUTION AND TRANSMISSION LINES
Refer to chapter 296-45 WAC, "Safety norm required electrical workers."
PART V
ROLLOVER PROTECTIVE STRUCTURES AND OVERHEAD DEFENSE
HTMLPDF296-155-950Rollover preventive structures (ROPS) since material how equipment.
HTMLPDF296-155-955Minimum performance criteria for rollover protective structures for designated scrapers, autoloader, dozers, graders, real crawler tractors.
HTMLPDF296-155-960Protective build (ROPS) test procedures furthermore performance request for wheel-type agricultural and industrial farm used in construction.
HTMLPDF296-155-965Overhead protection for actors about agricultural additionally industrial tractors.
Site Substance
Selected content schedule into alpha order under each group